top of page

CONCRETE TROWELLING SYSTEM

A power trowelled slab built to the standard declared for your project.

Concrete Trowelling Works, Superflat floor, flat floor, TR34, ASTM1155, BS8204

CTW is our power trowelling system for new slabs. We confirm the standard before the pour: TR34 (4th Ed.), BS 8204 SR or ASTM E1155. We then coordinate the concrete delivery, screed, float and trowel the slab, cure it, and measure and report the result.

1. Confirm the standard: TR34, BS 8204-2 SR or ASTM E1155
2. Coordinate concrete delivery
3. Screed to level
4. Float and power trowel
5. Cure
6. Measure and report

Let's Discuss 
Your Next Project

Fill out the form, or call us to

set up a free on-site consultation.​

FB_logo_Grey_only®_edited_edited.png

SYNEXT FLOORING (M) SDN BHD

No 40, Jalan 12/152 Taman Perindustrian OUG, 58200, Kuala Lumpur Wilayah Persekutuan.

+6016-323 0519

  • Whatsapp
  • LinkedIn
  • Facebook
  • Instagram
  • TikTok

Contact us

bottom of page